An 8D report needs two causes
What is an 8D report? The document a supplier sends to answer a complaint in eight disciplines, D1 to D8, and what the customer checks in each one.

What is an 8D report? It is the document a supplier sends a customer to answer a complaint in eight disciplines, D1 to D8: team, problem description, immediate measures, failure causes, planned and implemented corrective measures, preventing a repeat, and acknowledging the team’s success. The VDA defines 8D as the eight process steps that must be carried out when processing a complaint, to find the underlying problem and avoid a recurrence.
What the customer checks inside it is written in the customer’s own supplier requirements.
We read five that European manufacturers publish, in November 2026. Three of them ask for two root causes: why the defect happened, and why nobody caught it.
What is an 8D report, discipline by discipline
| D | VDA name | What customers check, from the five documents |
|---|---|---|
| D1 | Team | - |
| D2 | Problem description | - |
| D3 | Immediate measure(s) | Every stock checked: own, customer, consignment, in transit, in production, in packing (ARNOLD); all potential products (BSH); sorting with clearly defined test features (SEW) |
| D4 | Failure cause(s) | The cause of occurrence and the cause of non-detection (ARNOLD, SEW, BSH); Ishikawa and 5-Why mandatory (ARNOLD); every possible cause verified (THIELE) |
| D5 | Planned corrective measure(s) | Evidence of verification attached (ARNOLD) |
| D6 | Implemented corrective measure(s) | Evidence of validation attached (ARNOLD); introduction monitored on site (SEW); final verification by the customer (THIELE) |
| D7 | Prevent a repeat of the failure | FMEA and control plan updated, lessons transferred to other processes, products and locations (BSH) |
| D8 | Acknowledge the team’s success | At closure, the report is scored: at least 70 of 100 points to close (ARNOLD), fewer than 7 points rejected (MAGURA) |
Some guides add a D0 for the emergency response before the team is formed. The VDA lists D1 to D8.
Two causes, not one
ARNOLD’s minimum requirements list “Fehlerursache für das Auftreten” and “Fehlerursache für das Nichterkennen”: the cause of occurrence and the cause of non-detection. ARNOLD also asks for the point where the defect escaped.
SEW-EURODRIVE asks the same two questions: the cause of the fault, and the reasons it was not discovered. BSH puts them as “Why did our processes let the failure occur?” and “Why did our processes not identify the failure?”
A report with one cause explains the defect. A report with two also explains why the customer found it before you did.
What the customer will not accept
SEW-EURODRIVE calls a cause such as “lack of attention” unacceptable. It also states that training, the four-eyes principle and manual checking cannot meet its requirements for corrective actions.
THIELE accepts no written or verbal statement other than its 8D form, and makes the final judgment of effectiveness itself.
Deadlines come from the customer
Each of the five documents sets its own.
| Customer | First response | Main report |
|---|---|---|
| SEW-EURODRIVE | D1 to D3 after 3 working days | D4 to D8 after the following 10 working days, then interim reports every 10 working days |
| MAGURA | Preliminary statement within 2 working days | Full 8D within 10 working days |
| THIELE | Containment within the reaction time in the inspection report | Up to and including D6 within 10 working days |
| BSH | Containment status after 2 days | Causes after 14 days, corrective actions after 60, completion after 90 |
| ARNOLD | Receipt confirmed within 24 hours | No deadline in days in the document |
More on deadlines, and on the engineering hours behind them, in Your customer sets the 8D clock.
Before you send the next one
- Open your customer’s supplier requirements, not a generic template.
- Check D4 for two causes: occurrence and non-detection.
- Check D3 against every place the stock can be.
- Attach the evidence for D5 and D6, not a description of it.
In SolveR, the engineer goes through D0 to D8 and the customer gets the whole answer in one document, while the case stays in the knowledge base for the next similar complaint.
More on galileon.si
- The 8D method, step by step
- Your 8D template forgets one question
- 8D report software compared
- Customers ask for 8D, not A3
References
- VDA QMC (Germany), Definition of Failure Cause Categories for 8D Reporting, 1st edition, June 2017, section 1. PDF
- VDA QMC (Germany), 8D - Problemlösung in 8 Disziplinen, 1st edition, November 2018. VDA webshop
- ARNOLD (Germany), Mindestanforderung 8D-Report Lieferanten, AA-00472, version 2.00, 26 May 2023. PDF
- SEW-EURODRIVE (Germany), 8D process specifications for suppliers, document 2267 6317 / 0219, no date. PDF
- THIELE (Germany), 8D-Report Leitfaden für Lieferanten, revision 01, December 2016. PDF
- BSH (Germany), 8D Method Overview for Suppliers, version 1.0, April 2021. PDF
- MAGURA (Germany), Lieferantenleitfaden / Supplier Guideline, version 2024-10, p. 29. PDF
- Christoph Roser, The History of the Eight Disciplines Problem Solving (8D), AllAboutLean, 8 July 2025. AllAboutLean