A new carton dents the panels

An 8D report example from D0 to D8 on a fictional complaint, 11 dented panels out of 60, with what the customer checks in each discipline.

A grey carton on black with sheet-metal panels standing inside it and one gold mark on a panel edge.

An 8D report example below fills all disciplines, D0 to D8, for one fictional complaint: 11 of 60 sheet-metal panels arrive at the customer with dented edges. For each discipline it shows what the team wrote and what the customer checks, taken from five 8D requirements that European manufacturers publish for their suppliers.

The case is invented. The company, the parts and every number in it are part of the example, not data.

The cause sits where many 8D reports never look: a packaging change that nobody connected to the packing instruction.

The 8D report example, D0 to D8

D What the team wrote (fictional) What the customer checks
D0 Complaint received, receipt confirmed the same day, the delivery quarantined Receipt confirmed within 24 hours (ARNOLD)
D1 Quality engineer as lead, packing team leader, production shift lead, logistics -
D2 Dents of a few millimetres on the long edges of 11 of 60 panels, found at the customer’s incoming inspection, first delivery after the switch to a new carton. Is: long edges, at the carton walls, new carton. Is not: short edges, flat surfaces, deliveries in the old carton, panels at final inspection -
D3 Every place the panels can be checked: own stock, in transit, customer stock, open production and packing orders. 100% edge inspection against a limit sample. Shipping in the old carton until the fix All stock locations (ARNOLD), all potential products (BSH), sorting with defined test features (SEW)
D4 Occurrence: the new carton has no edge protectors, and the panels hit the walls in transport. Verified with a transport test: dents in the new carton, none with protectors. Non-detection: final inspection runs before packing, and nothing checks a new packaging before the first delivery. Ruled out, with evidence: forming and handling at the line, because final inspection found no dents The cause of occurrence and the cause of non-detection (ARNOLD, SEW, BSH), verified (THIELE)
D5 Edge protectors in the new carton, a revised packing instruction, and a transport test for every new packaging. Test report attached Evidence of verification attached (ARNOLD)
D6 Implemented. The next deliveries reach the customer without dents; the customer confirms at incoming inspection Evidence of validation attached (ARNOLD), final verification by the customer (THIELE)
D7 The change procedure: a packaging change now triggers a review of the packing instruction and a transport test. PFMEA updated for the packing step. Checked on other products shipped in the same carton FMEA and control plan updated, lessons transferred to other processes, products and locations (BSH)
D8 Team acknowledged, report closed after the customer’s confirmation The report is scored, for example at least 70 of 100 points (ARNOLD)

Where the repeat stops

D5 fixes this carton, and only D7 stops the next packaging change from doing the same.

Without the change in D7, the next packaging change, made for a good reason by someone outside quality, brings the same dents back with a different carton. The cause that matters sits in the procedure.

Two causes, and the ones ruled out

The example names two causes in D4, because three of the five customer documents ask for both: why the defect happened and why it was not detected.

It also keeps the causes the team ruled out, with the evidence. In our pilot, SolveR proposed 8 to 16 possible causes per case and engineers kept 20 to 30 percent of them.

In my view, the reasons a cause was set aside are worth as much to the next team as the cause that was confirmed.

Use the example on your next complaint

  1. Write D2 with an “is” and an “is not” for every question: what, where, when, how many.
  2. In D3, list every place the parts can be, not only your own warehouse.
  3. In D4, name the cause of occurrence and the cause of non-detection, each with its test.
  4. In D7, change the system that let the defect through, and name the procedure you changed.

In SolveR, a closed 8D stays in the knowledge base with its causes and actions, so the next time someone describes dents after a packaging change, the case comes up with what worked.

More on galileon.si

  1. An 8D report needs two causes
  2. Your 8D template forgets one question
  3. The 8D method, step by step
  4. Pilot results: 10 real 8D cases at 8 manufacturers

References

  1. VDA QMC (Germany), Definition of Failure Cause Categories for 8D Reporting, 1st edition, June 2017, section 1. PDF
  2. ARNOLD (Germany), Mindestanforderung 8D-Report Lieferanten, AA-00472, version 2.00, 26 May 2023. PDF
  3. SEW-EURODRIVE (Germany), 8D process specifications for suppliers, document 2267 6317 / 0219, no date. PDF
  4. THIELE (Germany), 8D-Report Leitfaden für Lieferanten, revision 01, December 2016. PDF
  5. BSH (Germany), 8D Method Overview for Suppliers, version 1.0, April 2021. PDF
  6. MAGURA (Germany), Lieferantenleitfaden / Supplier Guideline, version 2024-10, p. 29. PDF
  7. Matej Kalčič, Z umetno inteligenco podprt organizacijski spomin (AI-Powered Organizational Memory), proceedings of the 10th International Scientific Conference, Faculty of Industrial Engineering Novo mesto, 14 May 2026, pp. 77-82. PDF
All posts