Complaints stall before the 8D starts
Customer complaint handling in manufacturing, step by step: receipt, containment, part analysis, 8D and closure, with the deadlines European customers set.

Customer complaint handling in manufacturing is the supplier’s answer to a defect the customer found. It runs from confirming receipt and containing every suspect part, through the analysis of the returned part and an 8D report, to closing the complaint with the customer.
The customer sets the clock in its supplier requirements. The first deadline comes long before an 8D can name a cause.
Customer complaint handling in manufacturing, step by step
| Step | What happens | What European customers ask |
|---|---|---|
| Receipt | Confirm the complaint, open the case | Receipt confirmed within 24 hours (ARNOLD) |
| Containment | Check every place the parts can be | Own stock, customer, consignment, in transit, in production, in packing (ARNOLD); preliminary statement within 2 working days (MAGURA); D1 to D3 within 3 working days (SEW); containment status after 2 days (BSH) |
| Part analysis | Get the returned part, test it, see whether the fault shows | Analysis within the lead time agreed with the customer (VDA field failure analysis, ZVEI) |
| Cause and correction | D4 to D6: the cause of occurrence and of non-detection, corrective actions with evidence | Full 8D within 10 working days (MAGURA); D4 to D8 within the following 10 working days (SEW); up to D6 within 10 working days (THIELE) |
| Closure | D7 and D8, the customer’s final verification | Final verification by THIELE; completion after 90 days (BSH) |
The part decides the cause
A returned part on the bench is the first hard evidence of what happened.
The VDA has a standard for field failure analysis, in its second edition of November 2018. It includes an example of guidelines for parts where no fault is found, called NTF.
ZVEI’s training material on that standard starts with the reception of the part, and its first step says: “Comply with agreed lead time requirements.” The 8D then continues outside the lead time for the part analysis.
The step nobody times
In a production company, I was told that the first answer to the customer goes out fast, and the case stalls when the parts have to be checked physically.
In my view, a plant measures the time to the first answer because the customer measures it. Nobody measures the time from the complaint to the part on the bench, so the delay hides in shipping and waiting, while the report looks on time.
Five times to measure on your next complaint
- From the complaint to the confirmed receipt.
- From the complaint to containment at every location.
- From the complaint to the part on the bench.
- From the complaint to a verified cause, of occurrence and of non-detection.
- From the complaint to the customer’s closure.
In SolveR, the complaint, the part analysis and the 8D stay in one case, so the next complaint on the same part starts from what was found.
More on deadlines and the hours behind them in Your customer sets the 8D clock.
More on galileon.si
- An 8D report needs two causes
- Your customer sets the 8D clock
- The 8D method, step by step
- 8D report software compared
References
- ARNOLD (Germany), Mindestanforderung 8D-Report Lieferanten, AA-00472, version 2.00, 26 May 2023. PDF
- SEW-EURODRIVE (Germany), 8D process specifications for suppliers, document 2267 6317 / 0219, no date. PDF
- THIELE (Germany), 8D-Report Leitfaden für Lieferanten, revision 01, December 2016. PDF
- BSH (Germany), 8D Method Overview for Suppliers, version 1.0, April 2021. PDF
- MAGURA (Germany), Lieferantenleitfaden / Supplier Guideline, version 2024-10, p. 28. PDF
- VDA QMC (Germany), Field Failure Analysis & Audit Standard, 2nd revised edition, November 2018. VDA webshop
- ZVEI (Germany), Application of VDA “Field Failure Analysis” in the Electronics Supply Chain, training support, process steps, revision 6, 1 July 2016. PDF